Wednesday, January 16, 2013
Henley Construction Company reports that they have
- Installed steel framing enclosure, chiller area
- Completed interior spray fireproofing 1st Floor SW
- Started 1st floor SE spray fireproofing
- Continued installing air barrier;
- Continued interior wall framing;
- Started mock up for fiber cement panels
- Started window flashings
- Continued with low roof installation
- Continued with electric panel equipment main electric room
- Continued testing and installing ducts
- Continued mechanical and plumbing rough-in all areas
- Started stone veneer, and
- Started electric rough-ins on second floor.
Posted by K. Bowman
CATEGORIES:
POSTED AT: 11:35:00 AM
|