Monday, November 29, 2010
The Maryland Department of Transportation’s State Highway Administration (SHA) has begun resurfacing 1.4 miles of University Boulevard (Maryland Route 193) between Arcola Avenue and US 29 (Colesville Road). In preparation for the winter, the first stage is temporary asphalt patching to smooth out the most damaged sections of roadway.
Under the project, the road will be ground, patched and resurfaced,; sidewalks and ramps will be reconstructed to comply with Americans with Disabilities Act requirements; inlets and pipes will be cleaned and repaired; repair and/or replace curbs, gutters and guardrails will be repaired and/or replaced; and new pavement markings will be installed. SHA expects the work to be completed in fall 2011.
For more information, contact SHA at 1-800-749-0737 or SHADistrict@sha.state.md.us.
CATEGORIES:
Projects
POSTED AT: 1:00:00 AM
|