Location

Project Scope

    Start Date

Status

Aspen Hill Park/Wheaton Woods

Residential Concrete Repair/Replacement

TBD

 
Aspen Hill Road - Between MD 97 and Frankfort Dr.

Concrete Repairs

TBD

 
Beach Drive - at Old Spring Rd.

Storm Drain Repairs

TBD

 
Colesville Road

Primary/Arterial Road Asphalt Paving

5/6/2013

 
Connecticut Ave. Park/Stoneybrook Ests.

Residential Concrete Repair/Replacement

TBD

 
Fenton Street - From Wayne Ave. to Cameron St.

Primary/Arterial Road Asphalt Paving

TBD

 
Glenmont Village Subdivision

Residential Road Asphalt Paving

TBD

 
Greenwood Knolls

Residential Concrete Repair/Replacement

10/29/2012

75%

Newport Mill Road

Primary/Arterial 2x Micro Surfacing

5/8/2013

5%

Randolph Road - From MD 185 to MD 586

Primary/Arterial Road Asphalt Paving

TBD

 
Stoneybrook Estates

Residential Concrete Repair/Replacement

10/8/2012

30%

Weller Road

Primary/Arterial 2x Micro Surfacing

5/6/2013

5%

TBD = Schedule is to be determined at a later date

 

 

 